Apt B Rehab - St. Louis

Repaired drywall, primed/painted, installed utilities, flooring, trim.

Repaired plaster, new drywall over ceiling, installed closet doors, ceiling fan,
painted & primered room.

Framed out & hungdrywall for southside sink wall, stained & hung cabinets,
installed counter tops, lighting & sink with faucet, laid flooring, replaced exterior
entry door to the left which you can't see from this angle but is on the right in the
picture below, nailed down trim, primer & painted room, caulked the window.

Special ordered trim around exterior door to match up as close as
possible to existing trim leading into living room.
Customer did not want us to paint over the wood wall on the left side,
rather the wall paper only was stripped off.
________________________________________________________
Apt A - We were hired to finish up this unit

Installed entry door, baseboard, lighting.

Repaired drywall hole behind toilet, installed new toilet, flooring, trim,
primered & painted walls eggshell .

Stained & installed left side cabinets & counter, installed flooring
and trim.

Installed closet doors, baseboard, and ceiling fan.