Meet Mike in our rehabbed kitchen. Everything is from scratch except the cooking. The house was a burnout that sold for $5,000 cash. We rebuilt the walls, hired an electrician, did the dusty drywall work, laid some tile, installed the sink, counter, lighting, windows, appliances, you name it. We work together so the neutral colors are more his style. I painted the walls doing an original design on the ceiling, choosing cherry for the stained oak cabinets since high school woodshop class taught how to do that. We enjoyed the hard work; Mike and I both have a German side that doesn't mind it.

Ceiling in Kitchen & Lighting





Once a triangular-shaped kitchen storage closet, we knocked that out before
turning the space into an upstairs 1/2 bath.

This new 1/2 wall replaced an old burgundy iron handrail that had
separated the room from the unseen basement stairs on the other side.

This entry way into the dining room used to be half in size, occupied immediately
on the left by an old coat closet, so by knocking it out, the living spaces opened
right up to create a larger look.
_______________________________________________________________
R6 Apt B Rehab - St. Louis

Repaired drywall, primed/painted, installed utilities, flooring, trim.

Repaired plaster, new drywall over ceiling, installed closet doors, ceiling fan,
painted & primered room.

Framed out & hungdrywall for southside sink wall, stained & hung cabinets,
installed counter tops, lighting & sink with faucet, laid flooring, replaced exterior
entry door to the left which you can't see from this angle but is on the right in the
picture below, nailed down trim, primer & painted room, caulked the window.

Special ordered trim around exterior door to match up as close as
possible to existing trim leading into living room.

Customer did not want us to paint over the wood wall on the left side,
rather the wall paper only was stripped off.
________________________________________________________
R6 Apt A - We were hired to finish up this unit

Installed entry door, baseboard, lighting.

Repaired drywall hole behind toilet, installed new toilet, flooring, trim,
primered & painted walls eggshell .

Stained & installed left side cabinets & counter, installed flooring
and trim.

Installed closet doors, baseboard, and ceiling fan.
Tile Floor Installation. Also stained the cabinets Red Mahogany before hanging the oak units.
St. Louis
Painted stairs & walls then installed the new white hand rail.
Laid tile in the entryway, did all the two-tone painting that you see, plus...
Installed French Doors but first had to knock out a hole in the wall so that there would be another entryway leading out into the hallway (at the owners request). We laid carpet and painted all the rooms.